检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:席步云[1] Xi Buyun(Harbin Electric Machinery Company Limited,Harbin,China)
出 处:《科学技术创新》2023年第11期86-89,共4页Scientific and Technological Innovation
摘 要:在研究水电站自动发电控制的过程中,针对水轮发电机机组有功功率闭环控制进行建模与仿真,能够运用上下游水位制定机组运行方案,控制总平衡输出功率值不变。本研究首先进行水轮发电机组有功功率闭环控制的算法分析,并对控制环节进行了建模仿真,尽量降低机组运行时实际水头值与设定水头值之间误差,从而提升水电站自动化运行效果。In the process of studying the automatic power generation control of hydropower station,modeling and simulation for the closed-loop control of the active power of the hydro-generator unit can use the upstream and downstream water levels to develop the operation scheme of the unit.In this research,the algorithm analysis of the closed-loop control of the active power of the hydro-generator unit is firstly carried out,and the modeling simulation of the control link is carried out,so as to minimize the error between the actual and the set water head value during the unit operation,so as to improve the effect of the automatic operation of the hydropower station.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.136.11.217