作 者:王瑞莲[1] 姜军 李锐[1] 罗旻海[1] 姚莉[1] 杨天翔 WANG Ruilian;JIANG Jun;LI Rui;LUO Minhai;YAO Li;YANG Tianxiang(Research Institute of Natural Gas Economy,PetroChina Southwest Oil&Gasfield Company,Chengdu,Sichuan 610051,China;Chongqing Gas District,PetroChina Southwest Oil&Gasfield Company,Chongqing 400707,China)
机构地区:[1]中国石油西南油气田公司天然气经济研究所,四川成都610051 [2]中国石油西南油气田公司重庆气矿,重庆400707
出 处:《天然气技术与经济》2023年第2期75-80,88,共7页Natural Gas Technology and Economy
摘 要:为了准确预测页岩气田井工程投资,有效控制建井成本,指导油气行业实现页岩气效益开发,以某页岩气田井工程成本为研究对象,分析了学习曲线在国内外的应用情况及影响因素,形成了页岩气田井工程学习曲线,并建立了井工程成本指标体系。研究结果表明:①国内已有的页岩气学习曲线,仅反映了钻井和压裂试气投资随着时间及经验的变化,未反映钻前及配套工程投资随着时间及经验的变化,不适用于含钻井工程、压裂试气工程和钻前及配套工程在内的页岩气田井工程投资预测;②页岩气田井工程成本中压裂及钻井工程分别占总成本的50%和40%左右,其中,压裂工程费用主要受压裂段数影响;③方案设计工程量与实际实施工程量的偏差对钻前及配套工程费用影响较大。结论认为:①新建立的页岩气田井工程学习曲线能有效预测含钻井工程、压裂试气工程和钻前及配套工程在内的页岩气田井工程投资;②在钻井工程费用中,钻井液费用是成本控制的重点和难点;③在设计阶段,应综合考虑各种因素,尽量提高方案设计的准确性。In order to accurately predict well-engineering investments,effectively control well-construction costs in shale gas fields and realize beneficial development of shale gas,the application of learning curves in China and abroad and their influential factors were investigated by taking the well-engineering cost in one shale gas field as an example.On this ba⁃sis,learning curves of well engineering were formed and the engineering cost indicator system was established for shale gas fields.Results show that(i)since those ready-made learning curves used for shale gas in China only reflect investment changes in drilling and fracturing&gas testing with time and experiences while not mirror the changes in pre-drilling and associated engineering,they are not applicable to predicting the engineering investment to shale gas wells which covers drilling,fracturing&gas testing,and pre-drilling and associated engineering;(ii)fracturing and drilling account for about 50%and 40%in the well-engineering cost in shale gas fields,respectively,in which the fracturing cost is mostly affected by the number of fracturing segments;and(iii)a workload deviation between plan design and engineering exerts a larger ef⁃fect on the cost of pre-drilling and associated engineering.In conclude,the newly-developed learning curves can vividly forecast the engineering investment containing drilling,fracturing&gas testing,pre-drilling and associated engineering;drilling-fluid cost serves as the emphasis and difficulty for cost control in drilling;and all kinds of factor should be taken into account in the design process to maximize the accuracy of plan design.
分 类 号:TE37[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.95.146