检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙强 李夏 江照伟 SUN Qiang;LI Xia;JIANG Zhaowei(Shandong Transportation Research Institute,Jinan 250102)
出 处:《石油沥青》2023年第2期42-46,共5页Petroleum Asphalt
摘 要:针对桥面沥青铺装低温施工的问题,依托某黄河特大桥桥面沥青铺装施工工程,系统研究了不同施工环境因素对黄河特大桥桥面沥青铺装压实的影响,研究表明:气温、摊铺厚度与有效压实时间成正相关关系,风速与有效压实时间成负相关关系;并从沥青混合料级配设计和施工工艺方面提出低温施工条件下桥面沥青铺装质量保障技术,最终黄河特大桥桥面沥青铺装施工效果良好,各项检测指标均符合设计要求.In view of the problem of low temperature construction of bridge deck asphalt pavement,based on a bridge deck asphalt pavement construction project of a Yellow River Bridge,the influence of different construction environmental factors on the asphalt pavement compaction of the bridge deck of the Yellow River Bridge is systematically studied.The results showde that air temperature,paving thickness and effective compaction time are positively correlated,while wind speed and effective compaction time are negatively correlated.And from the asphalt misture gradation design and construction technology,the quality assurance technology of bridge deck asphalt pavement under low temperature construction conditions was proposed.Finally,the construction efect of asphalt pavement on the bridge deck of the Yellow River Bridge was good,and all detection indicators meet the design requirements.
关 键 词:黄河特大桥 沥青铺装 有效压实时间 混合料优化设计 施工工艺
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.85.79