检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周子正 贾云全 刘雪莲 Zhou Zizheng;Jia Yunquan;Liu Xuelian(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)
出 处:《广东化工》2023年第7期27-30,53,共5页Guangdong Chemical Industry
摘 要:高放废液玻璃固化供料系统的稳定对于玻璃固化体产品质量控制有重要影响。正在运行的VPC项目的供料系统采用一级真空辅助空提,但其输送速率受浸没度影响较大。在此基础上,R项目110子项供料系统改进为二级真空辅助空提。本文对VPC项目供料系统在调试中出现的问题进行了分析。对110子项的二级真空辅助空提供料系统进行了介绍。并对以水为输送介质的二级真空辅助空提试验结果进行了分析。The stability of feeding system in HLLW vitrification has a strong influence on the quality control of the waste glass.The feeding system in VPC plant which is in service transfer waste liquid via one-stage vacuum support airlift.But there was something wrong during the commissioning.So the feeding system in 110 project is modified to two-stage vacuum support.In this article,the problem in VPC plant feeding system during commissioning was analyzed.The two-stage in 110 project is modified to two-stage vacuum support.In this article,the problem in VPC plant feeding system during commissioning was analyzed.The two-stage vacuum support airlift in 110 project feeding system was introduced.And the experimental data in the two-stage airlift experiment transferring water was analyzed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49