检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余健[1] 刘蕊[1] 郭鹏 YU Jian;LIU Rui;GUO Peng
机构地区:[1]中国电建集团北京勘测设计研究院有限公司,北京100024
出 处:《东北水利水电》2023年第5期19-22,45,72,共6页Water Resources & Hydropower of Northeast China
摘 要:清原抽水蓄能电站通过对岩锚梁岩台爆破开挖、锚杆安装及混凝土施工等质量工艺的精细化管控,岩锚梁开挖轮廓成型规整,锚杆质量符合设计标准,混凝土质量综合评价为优良,满足电站安全稳定运行要求,其成果为国内地下厂房岩锚梁施工提供了工程实例和技术经验。Qingyuan Pumped Storage Power Station through the fine control of the rock anchor beam platform blasting excavation,anchor bolt installation and concrete construction and other quality technology,rock anchor beam excavation contour shape is orderly,the anchor rod quality meets the design standards,the concrete quality comprehensive evaluation is excellent,meet the requirements of safe and stable operation of power station,the results provide engineering examples and technical experience for the construction of rock anchor beam in domestic underground powerhouse.
分 类 号:TV31.6[水利工程—水工结构工程] TV52
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.251.36