检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯文林 侯芳洲 HOU Wenlin;HOU Fangzhou(Xinxiang Survey and Design Institute of Water Conservancy,Xinxiang 453000,China;Xinxiang Zhongyuan Water Conservancy Design and Research Institute,Xinxiang 453000,China)
机构地区:[1]新乡市水利勘测设计院,河南新乡453000 [2]新乡市中原水利设计研究院,河南新乡453000
出 处:《河南水利与南水北调》2023年第3期45-46,55,共3页Henan Water Resources & South-to-North Water Diversion
摘 要:根据规范,上游有控制性工程时,设计断面的洪水过程线应使用“地区组成法”推求。但关于地区组成法如何应用、设计断面的洪水过程线应如何叠加生成,规范中却未明确说明。文章通过塔岗水库除险加固工程中水文分析的实例,对地区组成法加以阐释。According to the specifications,when there are control projects upstream,the flood hydrograph of the design section should be calculated using the“regional composition method”.However,how to apply the regional composition method and how to superimpose and generate the flood hydrographs of the design section are not explicitly stated in the specifications.This paper explains the regional composition method through the examples of hydrological analysis in the danger control and reinforcement project of Tagang Reservoir.
关 键 词:地区组成法 设计频率洪水 相应洪水 洪水过程线 洪水叠加
分 类 号:TV122.3[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.52.101