井子水库堆石坝填筑碾压试验及结果分析  被引量:1

Rolling Test and Result Analysis of the Jingzi Reservoir Rockfill Dam

在线阅读下载全文

作  者:郭仲敏 GUO Zhong-min

机构地区:[1]山西省水利水电工程建设监理有限公司,山西太原030002

出  处:《山西水利科技》2023年第1期55-58,共4页Shanxi Hydrotechnics

摘  要:为了复核堆石坝填筑设计标准的合理性,确定达到设计标准的压实方法,在大坝主体工程施工前,需要对不同填筑区填筑材料进行碾压试验。通过对井子水库各填筑区碾压试验方法、试验过程的阐述,以及对碾压试验结果的分析,确定了适用于本工程大坝填筑的施工机械、铺料厚度和碾压遍数等施工参数。In order to review the rationality of the design criteria for rockfill dam filling and determine the compaction method to meet the design criteria,it is necessary to carry out rolling tests on the filling materials in different filling areas before the construction of the main works of the dam.Through the elaboration of the rolling test method and process of each filling area of the Jingzi Reservoir and the analysis of the rolling test results,the construction parameters such as construction machinery,paving thickness and rolling times suitable for the dam filling of this project are determined.

关 键 词:井子水库 碾压试验 结果分析 

分 类 号:TV62[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象