作 者:宋海龙 叶冬萌 史磊 梁天宇 柴斌 杨松浩 郝治国[2] SONG Hailong;YE Dongmeng;SHI Lei;LIANG Tianyu;CHAI Bin;YANG Songhao;HAO Zhiguo(Ultra High Voltage Company of State Grid Ningxia Power Co.,Ltd.,Yinchuan 750011,China;School of Electrical Engineering,Xi’an Jiaotong University,Xi’an 710049,China;State Grid Ningxia Power Co.,Ltd.,Yinchuan 750001,China)
机构地区:[1]国网宁夏电力有限公司超高压公司,银川750011 [2]西安交通大学电气工程学院,西安710049 [3]国网宁夏电力有限公司,银川750001
出 处:《高压电器》2023年第5期19-27,共9页High Voltage Apparatus
基 金:国网宁夏电力有限公司科技项目(5229CG20006D);宁夏回族自治区重点研发计划重点项目(后支持类)(2021BDE931015)。
摘 要:对于特高压直流工程,换流器区域故障后采用换流器移相控制有助于故障限流和隔离,但基于电流特征的断路器失灵保护适应性显著降低。为此,在分析断路器在时域、频域的失灵特征的基础上,文中提出了通过电压信号不同频段能量分布进行失灵诊断等研究思路。其次,将完全总体经验模态分解和希尔伯特—黄变换相结合,并在考虑互感器拖尾现象等基础上,提出了一种基于不同频段电压积分值的断路器失灵保护新原理。最后,制定了失灵保护出口后的后续动作策略。仿真验证表明,失灵保护原理满足了速动性和可靠性要求,后续动作策略实现了故障的快速隔离,显著提升了换流器区域保护的性能。For ultra-high voltage direct current(UHVDC)projects,the use of converter phase-shift control after a fault inside the converter protection zone is helpful for fault current limitation and isolation.Horever,the adaptability of circuit breaker failure protection based on current characteristics is significantly reduced.Therefore,on the basis of analyzing the failure characteristics of circuit breakers in the time and frequency domains,the research idea of failure diagnosis through the energy distribution of voltage signals in different frequency bands is proposed in this paper.Moreover,the complementary ensemble empirical mode decomposition(CEEMD)and Hilbert-Huang transform are combined and,on the basis of considering the tailing phenomenon of the instrument transformer,a kind of new principle of circuit breaker failure protection based on the voltage integral value of different frequency bands is proposed.Finally,the follow-up operation strategy after the failure protection operation is formulated.The simulation verification shows that the failure protection principle has met rapidity and reliability requirement,and the follow-up operation strategy has achieved the rapid isolation of the fault and significantly improved the performance of the converter area protection.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.189.143