检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈建宏[1] 赵亚坤 杨珊[1] 钟旭东[1] CHEN Jianhong;ZHAO Yakun;YANG Shan;ZHONG Xudong(School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China)
机构地区:[1]中南大学资源与安全工程学院,湖南长沙410083
出 处:《黄金科学技术》2023年第2期292-301,共10页Gold Science and Technology
基 金:国家自然科学基金项目“复杂地质体及矿山工程实体动态剪切技术与方法研究”(编号:52274163);“基于人工智能的矿山经济指标动态优化”(编号:51404305)联合资助。
摘 要:针对矿山企业普遍存在的配矿手工计算精度低、入选矿石品位波动大、矿量不均衡和生产数据管理碎片化的问题,基于大均化联合配矿技术理论和蚁群—蚁周算法模型,建立了大均化配矿数学模型;基于大均化联合配矿技术路线及矿山现场情况,提出了生产数据集成共享一体化管理方法。通过对配矿模型的解算生成符合生产实际的大均化配矿自动指令单,并以ASP.NET低代码开发平台、B/S框架和SQL Server数据库技术为基础,引入大数据图表结合分析技术和集成数据接口技术开发了大均化联合配矿及生产数据集成共享系统。以大宝山多金属矿的应用情况为例,结果表明:系统投入使用后,矿山配矿生产的全流程实现了系统化流水作业,与原配矿方式相比,矿石品位稳定均衡,提高了综合回收率,控制了入选矿石品位波动范围,提高了矿山管理水平和矿产品质量。With the upgrading of mine production modes and the renewal of business philosophy,the problems that commonly exist in mining enterprises,such as low accuracy in manual calculation of ore blending,large fluctuations in ore grade,unbalanced ore quantities,and fragmentation of production data management,have become more and more obvious.Starting from the blending and production data management of ore management work,the mathematical model of large homogenized joint ore blending was established based on the theory of large homogenized joint ore blending technology and the ant colony-ant cycle algorithm model.The integrated management method of production data integration and sharing was proposed based on the large homogenized joint ore blending technology route and the mine on-site situation,summarizing the process,key data,and hierarchical linkage relationship.A large homogenized joint ore blending and production data integration and sharing system was constructed based on the ant colony-ant cycle model.Firstly,integrating the multi-stage ore blending in the mining site,stockpile,and processing plant,optimizing the blending quantity and ore grade from a global perspective,proposing the theory of a large homogenized joint ore blending technology,and establishing a large homogenized joint ore blending function according to the actual blending.Secondly,using the ant colony-ant cycle algorithm as the modeling framework of the blending model,establishing the mathematical model of large homogenized ore blending based on the large homogenized transformation,taking the large homogenized cycle as the number of iterations,and continuously adjusting the blending quality through the automatic blending order output from the model in the producing cycle.Finally,based on the ASP.NET low-code development platform,the B/S framework,and SQL Server database technology,big data charting combined with analysis technology and integrated data interface technology were introduced to develop a large homogenized joint ore blending and produ
关 键 词:大均化联合配矿 蚁群—蚁周模型 B/S框架 生产数据集成共享系统 矿石品位
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15