Data-Driven Model for Risk Assessment of Cable Fire in Utility Tunnels Using Evidential Reasoning Approach  

在线阅读下载全文

作  者:彭欣 姚帅寓 胡昊 杜守继 PENG Xin;YAO Shuaiyu;HU Hao;DU Shouji(School of Naval Architecture,Ocean&Civil Engineering,Shanghai Jiao Tong University,Shanghai 200240,China)

机构地区:[1]School of Naval Architecture,Ocean&Civil Engineering,Shanghai Jiao Tong University,Shanghai 200240,China

出  处:《Journal of Donghua University(English Edition)》2023年第2期202-215,共14页东华大学学报(英文版)

基  金:Airport New City Utility Tunnel PhaseⅡProject,China。

摘  要:Cable fire is one of the most important events for operation and maintenance(O&M)safety in underground utility tunnels(UUTs).Since there are limited studies about cable fire risk assessment,a comprehensive assessment model is proposed to evaluate the cable fire risk in different UUT sections and improve O&M efficiency.Considering the uncertainties in the risk assessment,an evidential reasoning(ER)approach is used to combine quantitative sensor data and qualitative expert judgments.Meanwhile,a data transformation technique is contributed to transform continuous data into a five-grade distributed assessment.Then,a case study demonstrates how the model and the ER approach are established.The results show that in Shenzhen,China,the cable fire risk in District 8,B Road is the lowest,while more resources should be paid in District 3,C Road and District 25,C Road,which are selected as comparative roads.Based on the model,a data-driven O&M process is proposed to improve the O&M effectiveness,compared with traditional methods.This study contributes an effective ER-based cable fire evaluation model to improve the O&M efficiency of cable fire in UUTs.

关 键 词:underground utility tunnel(UUT) risk assessment evidential reasoning(ER) operation and maintenance(O&M) 

分 类 号:TP374.2[自动化与计算机技术—计算机系统结构]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象