检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:温志锋 WEN Zhifeng(Zhongshan Public Environmental Protection Industry Investment Co.,Ltd.,Zhongshan 528403,China)
机构地区:[1]中山公用环保产业投资有限公司,广东中山528403
出 处:《中国高新科技》2023年第6期87-88,91,共3页
摘 要:国内垃圾焚烧电厂常遇到焚烧炉处理能力与余热锅炉出力不匹配的问题,垃圾热值实际比设计值高,炉膛结焦导致受热面吸热差而造成过热器入口烟温偏高,种种原因导致垃圾焚烧余热炉负荷难以达到设计额定量,制约了垃圾焚烧量。文章通过真实的受热面改造案例,分析焚烧余热炉改造可行方向和注意事项。Domestic waste incineration power plants often encounter that the treatment capacity of the incinerator does not match the output of the waste heat boiler,the actual calorifi c value of the waste is higher than the design value,the furnace coking leads to the diff erential heat absorption of the heating surface,resulting in the high fl ue gas temperature at the superheater inlet,and various reasons lead to the diffi culty of the waste incineration waste heat boiler load to reach the design amount,thus restricting the waste incineration quantity.This paper analyzes the feasible direction and precautions of the incineration waste heat furnace transformation through a real heating surface transformation case.
分 类 号:X799[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.119.156