检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卫天笑 WEI Tianxiao(Shanghai Construction No.7(Group)Co.,Ltd.,Shanghai 200050,China)
出 处:《建筑施工》2023年第4期693-696,共4页Building Construction
摘 要:超高层建筑核心筒内安装的内爬式塔机附着装置一般通过塔机自身吊装或拖运到核心筒外框吊运实现倒运,易受空间限制或核心筒外框施工进度较慢的影响。以上海张江中区单元57-01地块项目为背景,介绍了一种内爬式塔机附着装置倒运的方法。实践证明,该方法安全可靠,节省了施工工期和成本,可为类似超高层建筑核心筒内爬式塔机附着装置的倒运施工提供借鉴。The attached device of internal climbing tower crane installed in the core tube of super high-rise building is generally hoisted by the tower crane itself or hauled to the outer frame of the core tube for hoisting to implement reshipment,which is easily affected by the space limitation or the slow construction progress of the outer frame of the core tube.Based on the project of plot 57-01 of Zhangjiang Central Unit in Shanghai,a method of transporting the attached device of internal climbing tower crane is introduced.The practice proves that this method is safe and reliable,saves construction time and cost,and can provide reference for the construction of the attached device of the climbing tower crane in the core tube of similar high-rise buildings.
分 类 号:TU61[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49