内爬式塔机附着装置倒运技术研究  被引量:2

Research on Reshipment Technology of Attached Device of Internal Climbing Tower Crane

在线阅读下载全文

作  者:卫天笑 WEI Tianxiao(Shanghai Construction No.7(Group)Co.,Ltd.,Shanghai 200050,China)

机构地区:[1]上海建工七建集团有限公司,上海200050

出  处:《建筑施工》2023年第4期693-696,共4页Building Construction

摘  要:超高层建筑核心筒内安装的内爬式塔机附着装置一般通过塔机自身吊装或拖运到核心筒外框吊运实现倒运,易受空间限制或核心筒外框施工进度较慢的影响。以上海张江中区单元57-01地块项目为背景,介绍了一种内爬式塔机附着装置倒运的方法。实践证明,该方法安全可靠,节省了施工工期和成本,可为类似超高层建筑核心筒内爬式塔机附着装置的倒运施工提供借鉴。The attached device of internal climbing tower crane installed in the core tube of super high-rise building is generally hoisted by the tower crane itself or hauled to the outer frame of the core tube for hoisting to implement reshipment,which is easily affected by the space limitation or the slow construction progress of the outer frame of the core tube.Based on the project of plot 57-01 of Zhangjiang Central Unit in Shanghai,a method of transporting the attached device of internal climbing tower crane is introduced.The practice proves that this method is safe and reliable,saves construction time and cost,and can provide reference for the construction of the attached device of the climbing tower crane in the core tube of similar high-rise buildings.

关 键 词:超高层建筑 内爬式塔机 附着装置 倒运 

分 类 号:TU61[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象