地铁项目二期雨水管线迁改探讨  被引量:2

Discussion on the Transformation of Rainwater Pipeline in the Second Phase of Metro Project

在线阅读下载全文

作  者:吴发展 侯明鑫 Wu Fazhan;Hou Mingxin(The Erchu Co.,Ltd.of China Railway Tunnel Group,Sanhe,China)

机构地区:[1]中铁隧道集团二处有限公司,河北三河

出  处:《科学技术创新》2023年第12期126-129,共4页Scientific and Technological Innovation

摘  要:城市管线复杂交错,管网分布范围广,为保证新建工程的顺利进行,需要做好施工范围内既有管线的迁改工作,管线迁改应征得产权管理单位的同意确认,施工前采用物探、人工挖槽等方法核查管线的走向、用途、管径、基底高程等,编制管线迁改方案,为了确保沟槽周边管线安全、沟槽内施工人员安全,采用6m钢板桩+钢支撑形式对管线沟槽进行支护,从基坑土方开挖、管道施工、管沟回填方面,保证管线迁改工程的安全质量。In order to ensure the smooth progress of the new construction project,it is necessary to carry out the relocation of the existing pipelines within the construction scope,before construction,geophysical prospecting and manual trenching are used to check pipeline trend,usage,pipeline diameter,basement elevation,etc.,in order to ensure the safety of the pipeline around the trench and the safety of the constructors in the trench,the 6m steel sheet pile+steel support is adopted to support the pipeline trench,to ensure the safety and quality of the pipeline relocation project..

关 键 词:轨道交通 雨水管线 迁改 环境调查 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象