水轮发电机组安装中的问题与措施  被引量:1

Problems and Measures in the Installation of Hydroelectric Generating Units

在线阅读下载全文

作  者:刘双志 LIU Shuangzhi(Xinhua Hydropower Company Limited,Beijing,100071 China)

机构地区:[1]新华水力发电有限公司,北京100071

出  处:《科技资讯》2023年第8期56-59,共4页Science & Technology Information

摘  要:在水力发电站中,水轮发电机组所属核心设备,机组安装工作质量和发电站运行安全与稳定有重要影响。目前,水轮机安装阶段通常由于固定结构、轴线轴瓦间隙、镜板受力、高程控制等方面存在问题,致使安装质量受到影响,威胁机组的安全运行。该文对以上问题展开分析,重点论述机组安装问题的解决之策,期待通过详细分析,找到机组安装质量缺陷和应对策略,不断提高安装质量,促进水轮发电机安全运行,保证供电质量。In the hydroelectric power station,hydroelectric generating units are core equipment,and the installation quality of the unit has an important impact on the operation safety and stability of the power station.At present,in the installation stage of the turbine,the installation quality is usually affected due to problems in the fixed structure,axis shaft tile clearance,mirror plate force,elevation control and other problems,threatening the safe operation of the unit.The paper analyzes the above problems,and focuses on the solutions of the installation problems of the unit,looking forward to finding the installation quality defects and countermeasures of the unit through detailed analysis,constantly improving the installation quality,promoting the safe operation of the turbine generator,and ensuring the quality of power supply.

关 键 词:水轮发电机组 安装技术 固定结构 高程控制 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象