检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈集农 郭树宝 袁大鹏 CHEN Jinong;GUO Shubao;YUAN Dapeng
机构地区:[1]中国能源建设集团湖南火电建设有限公司,湖南长沙410015
出 处:《电力系统装备》2023年第4期12-14,共3页Electric Power System Equipment
摘 要:常规火力发电厂实施热电联产节能改造是提升能源利用效率的重要手段.文章以河北定州某发电厂供热改造工程为例,通过自行设计、制作滑移装置及吊装门架,采用多台卷扬机与手动链条葫芦进行协同、配合,成功解决了该电厂660 MW大型火电机组直接空冷岛蒸汽分配管加装蝶阀改造工程中,在复杂、狭小空间进行蝶阀移运及吊装的难题,积累了宝贵的工程经验.The energy-saving transformation of cogeneration in conventional thermal power plants is an important means to improve energy utilization efficiency.Taking the heat supply renovation project of a power plant in Dingzhou,Hebei Province as an example,this paper successfully solved the problem of butterfly valve transportation and hoisting in complex and narrow space during the renovation project of adding butterfly valve to the steam distribution pipe of the direct air cooling island of the 660 MW large thermal power plant by self-designed and manufactured sliding device and hoisting gantry,using multiple winches and manual chain hoists for cooperation and cooperation,and accumulated valuable engineering experience.
分 类 号:TM621[电气工程—电力系统及自动化] F426.61[经济管理—产业经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33