检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:常国华 Chang Guohua(Kuqa City Kexing Coal Industry Co.,Ltd.,XinjiangKuqa842000)
机构地区:[1]库车市科兴煤炭实业有限责任公司,新疆库车842000
出 处:《山东煤炭科技》2023年第4期39-41,共3页Shandong Coal Science and Technology
摘 要:分析榆树泉煤矿+1625 m泄水巷水文地质情况,得出顶板赋存大量裂隙、在采动影响下裂隙存在贯通形成导水通道危险的结论。为预防顶板突水,提出采用注浆手段加固顶板的方法,研究了泄水巷掘进前方布置施工定向注浆钻孔的技术,现场应用较好,保证了矿井的安全高效生产。Based on the analysis of the hydrogeological conditions of the+1625 m drainage roadway in Yushuquan Coal Mine,it is concluded that there are a large number offissures in the roof,and there is a danger of thefissures connecting to form a water diversion passage under the influence of mining.In order to prevent water inrush from the roof,the method of reinforcing the roof by grouting is proposed,and the technology of arranging directional grouting drilling holes in front of the drainage roadway excavation is studied.Thefield application is good,ensuring the safe and efficient production of the mine.
分 类 号:TD745[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49