花园煤矿条带煤柱稳定性数值模拟研究  

Numerical Simulation Study of Band Coal Pillars Stability in Huayuan Coal Mine

在线阅读下载全文

作  者:林海 胡安星 韩应伟 Lin Hai;Hu Anxing;Han Yingwei(Jining Mining Industry Group Huayuan Well Field Resources Development Co.,Ltd.,Shandong Jining 272200)

机构地区:[1]济宁矿业集团花园井田资源开发有限公司,山东济宁272200

出  处:《山东煤炭科技》2023年第4期45-48,共4页Shandong Coal Science and Technology

摘  要:为研究花园煤矿开采过程中条带煤柱稳定性,采用理论分析、数值模拟的手段,分别对煤柱内部应力、变形、塑性区分布特征进行研究。结果表明,条带煤柱内的应力集中程度明显高于边界煤柱,采空区中部煤柱应力集中系数最高,垂直位移量略高于其他煤柱,并且条带煤柱中部存在倒梯形的弹性核。In order to study the stability of band coal pillars in the mining process of Huayuan Coal Mine,the distribution characteristics of stress,deformation and plastic zone in the coal pillar are studied by means of theoretical analysis and numerical simulation.The results show that the stress concentration degree in the band coal pillar is significantly higher than the boundary coal pillar,the stress concentration coefficient of the coal pillar in the middle of the goaf is the highest,the vertical displacement is slightly higher than other coal pillars,and there is an inverted trapezoidal elastic kernel in the middle of the band coal pillar.

关 键 词:条带 煤柱 稳定性 模拟 

分 类 号:TD823.6[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象