检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐宜飞 Xu Yifei(Anhui Water Conservancy and Hydropower Survey Design Research Institute Co.,Ltd.,Hefei 230022,Anhui)
机构地区:[1]安徽省水利水电勘测设计研究总院有限公司,安徽合肥230022
出 处:《陕西水利》2023年第5期10-13,共4页Shaanxi Water Resources
摘 要:为验证新建水工渡槽承载能力,对引江济淮工程舒庐干渠渡槽进行充水试验,并采用有限元方法对试验全过程进行仿真分析,将各工况下的应变(应力)理论计算结果与现场实测数据进行对比分析,得出两者之间的相关性,最后依据公路桥梁荷载试验规程及试验成果,判断结构处于弹性工作状态,刚度满足设计要求,可为类似工程提供一定的参考依据。In order to verify the bearing capacity of the newly built hydraulic aqueduct,a water filling test was carried out on the Shulu main canal aqueduct of the Yangtze River to Huaihe River project.And the finite element method is used to simulate and analyze the whole process of the test.The theoretical calculation results of strain(stress)under each working condition are compared and analyzed with the field measured data,and the correlation between the two is obtained.Finally,according to the highway bridge load test regulations and test results,it is judged that the structure is in an elastic working state,and the stiffness meets the design requirements.It can provide a certain reference basis for similar projects.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.188.252