检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:巩江峰 王伟 黎旭 朱勇[2] GONG Jiangfeng;WANG Wei;LI Xu;ZHU Yong(China Railway Economic and Planning Research Institute Co.,Ltd.,Beijing 100038,China;China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,Sichuan,China)
机构地区:[1]中国铁路经济规划研究院有限公司,北京100038 [2]中铁二院工程集团有限责任公司,四川成都610031
出 处:《隧道建设(中英文)》2023年第4期721-738,I0037-I0054,共36页Tunnel Construction
摘 要:对截至2022年底中国铁路隧道、高速铁路隧道、特长铁路隧道情况进行统计。结果显示,截至2022年底,中国铁路营业里程达到15.5万km,其中,投入运营的铁路隧道17873座,总长21978 km;中国已投入运营的高速铁路总长超过4.2万km,共建成高速铁路隧道4178座,总长7032 km,其中,长度大于10 km的高速铁路特长隧道105座,长约1339 km;中国已投入运营的特长铁路隧道共259座,长约3498 km,其中,长度20 km以上的特长铁路隧道12座,长约283 km。最后,对2022年新开通的重点项目大瑞铁路大理至保山段、郑万铁路湖北至重庆段、新成昆铁路峨眉至冕宁段隧道的概况及特点进行介绍,并总结其技术经验。经过郑万铁路隧道建设的实践探索,逐步形成了隧道建设全工序、全地质、全断面机械化设计施工成套技术;大瑞铁路大理至保山段及新成昆铁路特长隧道的修建,为复杂艰险山区长大隧道的修建积累了宝贵经验。这些项目的成功修建为铁路隧道信息化、机械化建设,进而实现隧道智能化建造,以及高铁在复杂艰险山区的修建奠定了基础,彰显了我国在特殊复杂地质条件下隧道修建技术水平的进步。Statistical analysis is conducted on railway tunnel projects,high-speed railway tunnels,and extra-long railway tunnels in China by the end of 2022.It is shown that:(1)The operating mileage of railway has reached 155000 km in China.To be specific,17873 railway tunnels have been put into operation,with a total length of 21978 km.(2)The total length of high-speed railways that have been put into operation in China has exceeded 42000 km,and up to 4178 tunnels with a total length of 7032 km have been built for high-speed railways.Among them,105 are extra-long tunnels for high-speed railways with a length of more than 10 km each and a total length of about 1339 km.(3)259 extra-long railway tunnels have been put into operation in China,with a total length of about 3498 km.Among them,there are 12 extra-long railway tunnels over 20 km each,with a total length of about 283 km.Finally,the key projects newly put into operation in 2022,namely Dali-Baoshan section of Dali-Ruili railway,Hubei-Chongqing section of Zhengzhou-Wanzhou railway,and Emei-Mianning section of New Chengdu-Kunming railway,and their characteristics are briefly introduced.The construction technologies and experiences form a suit of full-process,full-geology,and full-face mechanized design and construction technology through application of the Zhengzhou-Wanzhou railway tunnel;the successful construction of the Dali-Baoshan section of the Dali-Ruili railway and extra-long New Chengdu-Kunming railway has laid a solid foundation for the construction of long-and-large tunnels located in complex mountainous areas.The successful construction of these projects has laid a good foundation for the information-based,mechanized,and intelligent construction of railway tunnels,laid a solid foundation for the construction of high-speed railways in complex and dangerous mountainous areas,and demonstrated the progress of tunnel construction technology in China under special and complex geological conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117