检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭鑫宇 程树辉 厉智成 贺蔚 寇晓霞 乔昕 汪聪 GUO Xinyu;CHENG Shuhui;LI Zhicheng;HE Wei;KOU Xiaoxia;QIAO Xin;WANG Cong(Beijing Municipal Engineering Design and Research Institute Co.,Ltd,Beijing 100082,China;State Key Laboratory of Hydrology,Water Resources and Hydraulic Engineering Science,Hohai University,Nanjing 210098,China)
机构地区:[1]北京市市政工程设计研究总院有限公司,北京100082 [2]河海大学水文水资源与水利工程科学国家重点实验室,南京210098
出 处:《环境工程》2023年第3期49-56,共8页Environmental Engineering
基 金:国家重点研发计划课题“给水和排水管网安全运行保障集成智能监管平台”(2016YFC0802407)。
摘 要:以我国南方某5个相互独立的圩内河网为研究对象,针对感潮河段的特征建立水动力水质耦合模型,比较不同闸门调度策略下的水质改善效果。结果表明:1)圩内河网应在大潮期进行换水,相对小潮期换水最多可缩短7 h的水力停留时间。以示踪剂工况结果为依据,针对进出水闸门距离较短河网,采用单向流调度策略启闭闸门,相对往复流最多可缩短14.18 h的水力停留时间;针对进出水闸门距离较长的河网,采用开启双侧闸门进水从中心排河排水的往复流闸门启闭策略,相对单向流调度策略最多可缩短3.18 h的水力停留时间。2)水质结果表明,应先利用水系连通方式打通断头河,并采用前述的闸门调度策略,最终本片区河网平均水质达到GB 3838—2002《地表水环境质量标准》Ⅳ类水的断面比例增长了7.3%。研究结果为基于水动力水质改善不同地理特征圩内潮汐河网的闸门调度提供了参考。This study took five independent polders’river networks in southern China as the research objects,established a hydrodynamic water quality coupling model according to the characteristics of the tidal reaches,and compared the water quality improvement effects under different gate scheduling strategies.The results showed that:1)for the polders’river network,water exchange should be carried out during the spring tide period,and the hydraulic retention time could be shortened by up to 7 hours compared with the neap tide period.Based on the results of the tracer operating condition,for the river network with a short distance between the inlet and outlet gates,the one-way flow scheduling strategy should be used to operate the gate,which could shorten the hydraulic retention time by up to 14.18 hours compared with reciprocal flows.For the river network with a long distance between the inlet and outlet gates,the reciprocal flows operation strategy of opening the gates on both sides to discharge water from the central drainage could shorten the hydraulic retention time by 3.18 hours,compared with the one-way flow scheduling strategy.2)the results of water quality showed that the deadhead river should be opened up first by water system connection,and then the aforementioned gate scheduling strategy should be adopted.The proportion of the polders’river network sections whose water quality reached class IV increased by 7.3%.The results of this paper can provide a reference for the improvement of hydrodynamic and water quality for gate scheduling of tidal river networks in different geographical features.
关 键 词:感潮河段 闸门优化调度 水动力水质耦合模型 水力停留时间
分 类 号:TV663[水利工程—水利水电工程] X52[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15