检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余天才 缪应东 李福年 YU Tian-cai;MIAO Ying-dong;LI Fu-nian(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China;Huadian Yunnan Power Generation Co.,Ltd.,Kunming 650228,China)
机构地区:[1]中国水利水电第十四工程有限公司,云南昆明650032 [2]华电云南发电有限公司,云南昆明650228
出 处:《云南水力发电》2023年第5期83-86,共4页Yunnan Water Power
摘 要:以礼河四级电站复建工程安装有4台32.5MW的全伞冲击式水轮发电机组。以该电站的推力头在现场热套,轴线调整时采用修磨卡环的施工工艺为载体进行论述。介绍了水电站推力头现场热套时的主要方法,热套时的控制重点,轴线调整过程中的注意事项,关键控制点等。Four 32.5MW full-umbrella impact hydro-generator units are installed in Yilihe Fourth Cascade Hydropower Station Reconstruction Project.In this paper,the construction technology of grinding snap ring for field heat jacket and axis adjustment of thrust head of the power plant is discussed.This paper describes the main methods of heat jacketing on site for thrust head of hydropower station,control key points during heat jacketing,precautions during axis adjustment and key control points.
分 类 号:TK735[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.210.36