水电站推力头热套机组盘车及轴线调整的施工要点  

Discussion on Construction Points of Turning and Axis Adjustment of Thrust Head Heat-jacket Unit of Hydropower Station

在线阅读下载全文

作  者:余天才 缪应东 李福年 YU Tian-cai;MIAO Ying-dong;LI Fu-nian(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China;Huadian Yunnan Power Generation Co.,Ltd.,Kunming 650228,China)

机构地区:[1]中国水利水电第十四工程有限公司,云南昆明650032 [2]华电云南发电有限公司,云南昆明650228

出  处:《云南水力发电》2023年第5期83-86,共4页Yunnan Water Power

摘  要:以礼河四级电站复建工程安装有4台32.5MW的全伞冲击式水轮发电机组。以该电站的推力头在现场热套,轴线调整时采用修磨卡环的施工工艺为载体进行论述。介绍了水电站推力头现场热套时的主要方法,热套时的控制重点,轴线调整过程中的注意事项,关键控制点等。Four 32.5MW full-umbrella impact hydro-generator units are installed in Yilihe Fourth Cascade Hydropower Station Reconstruction Project.In this paper,the construction technology of grinding snap ring for field heat jacket and axis adjustment of thrust head of the power plant is discussed.This paper describes the main methods of heat jacketing on site for thrust head of hydropower station,control key points during heat jacketing,precautions during axis adjustment and key control points.

关 键 词:电阻丝加热 推力头热套 假真实 自重找正 

分 类 号:TK735[交通运输工程—轮机工程]

 