检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王昉 李美双 宋晓辉[3] WANG Fang;LI Meishuang;SONG Xiaohui(Huaneng Zuoquan Coal&Power Co.,Ltd.,Jinzhong 032600,China;Huaneng Luoyang Thermal Power Co.,Ltd.,Luoyang 473000,China;Xi’an Thermal Power Research Institute Co.,Ltd.,Xi’an 710061,China)
机构地区:[1]华能左权煤电有限责任公司,山西晋中032600 [2]华能洛阳热电有限责任公司,河南洛阳473000 [3]西安热工研究院有限公司,西安710061
出 处:《吉林电力》2023年第2期49-52,共4页Jilin Electric Power
摘 要:针对二次再热机组甩负荷后,在维持转速稳定的过程中容易出现超高压缸和高压缸排汽温度超温现象,进而可能会出现切缸的问题,对甩负荷试验的必要条件、试验过程要点及试验数据进行梳理分析,详细阐述了甩负荷后出现超高压缸及高压缸排汽温度超限的控制方法,甩负荷后出现切缸及切缸后的重启控制,提出了三级旁路及其减温水配合甩负荷的控制方法。结果表明:甩负荷瞬态过程机组参数变化剧烈,数字式电液调节系统能快速响应,机组各调速汽门快速关闭,最高飞升转速及汽轮机转速动态超调量符合要求。使用三级旁路及其减温水配合甩负荷调整及严格执行试验规程的要求,可大大降低甩负荷瞬态过程的风险、提高机组运行的安全性。After the load rejection of the secondary reheat unit,it is easy to cause the overheating of the exhaust steam temperature of the ultra-high pressure cylinder and the high pressure cylinder during the process of maintaining the speed stability,which may lead to the problem of cylinder cutting.The paper analyzes the logic judgment of the load rejection process,and comprehensively discusses the necessary conditions of the load rejection test,the key points of the load rejection test process,and the test data.The control method of the exhaust steam temperature of the ultra-high pressure cylinder and the high pressure cylinder after the load rejection is described in detail.The process of stopping steam intake and restarting the cylinder block after load rejection is also discussed.A control method of three-stage bypass and its cooling water with load rejection is proposed.The results show that the unit parameters change drastically during the load rejection transient,the digital electro-hydraulic control system control system can respond quickly,and the speed control valves of the unit close quickly.After the load rejection,the unit's maximum flying speed and the dynamic overshoot of the steam turbine meet the requirements.Through the adjustment of the above technical means and the strict implementation of the requirements of the test regulations,the risk of the transient load rejection process can be greatly reduced,and the safety of the unit operation can be improved.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.111.102