连云港赣榆港区某码头基床顶高程的确定  

A Determination of Rubble Base Top Elevation for a Caisson Wharf in Ganyu Harbor of Lianyungang Port

在线阅读下载全文

作  者:刘佳 Liu Jia(Lianyungang Xinhaiwan Wharf Co.,Ltd.,Lianyungang Jiangsu 222113,China)

机构地区:[1]连云港新海湾码头有限公司,江苏连云港222113

出  处:《港工技术》2023年第2期69-72,共4页Port Engineering Technology

摘  要:结合连云港赣榆港区4~6号泊位码头方案设计和工程地质勘察报告,探讨沉箱码头抛石基床顶高程的影响因素,提出结合材料来源、工程建设费用、施工难易程度、远期发展等综合因素确定抛石基床顶高程,在保证有效持力层深度的前提下,通过减小设计规范计算取值,来降低抛石基床顶高程,减小抛石基床厚度,从而避免材料来源紧张导致的施工延期风险,降低工程造价和施工难度,提高施工质量,为远期发展预留充足空间,为以后类似工程建设提供借鉴。Based on the design and engineering geological investigation report of a caisson wharf in Ganyu Harbor of Lianyungang Port,the research discusses the influence on rubble base top elevation.A method for determinaion of rubble base top elevation is proposed by all aspects of material source,engineering cost,construction difficlty,long-term development,under the premise of ensuring effective depth of bearing stratum,reduce the rubble base top elevation and reduce the thickness of rubble base by reducing the value calculated in the design specification,so as to avoid the risk of the construction delay caused by the shortage of material sources,reduce the construction cost and the construction difficulty,improve the construction quality,reserve enough space for the long-term development,providing reference to the similar engineering project.

关 键 词:沉箱码头 工程地质 抛石基床顶高程 码头前沿设计底高程 

分 类 号:U656.111[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象