新型全装配式高桩码头π形梁板制作工艺  被引量:1

Production process ofπ-shape beam plate for new fully prefabricated high-piled wharf

在线阅读下载全文

作  者:张国明 王士勇 刘社豪 ZHANG Guoming;WANG Shiyong;LIU Shehao(Jiangsu Branch of CCCC Third Harbor Engineering Co.,Ltd.,Lianyungang 222042,China;CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China)

机构地区:[1]中交第三航务工程局有限公司江苏分公司,江苏连云港222042 [2]中交第三航务工程勘察设计院有限公司,上海200032

出  处:《水运工程》2023年第5期143-146,160,共5页Port & Waterway Engineering

摘  要:针对新型装配式高桩码头π形梁板无底板薄壁框架结构预制过程中因箱室内温度高、内模拆除难的问题,对无底板框架结构的预制工艺进行分析,同时引入分体式液压伸缩自动脱模工艺和电热蒸汽养护工艺。结果表明,自动脱模工艺解决了因π形梁板浇注混凝土后内腔温度高无法进行人工作业的难题;电热蒸汽养护工艺压缩构件起吊所需龄期,节约模板用量,提高预制效率。The thin-walled frame structure without a bottom plate ofπ-shape beam plate for a new prefabricated high-piled wharf faces high temperatures in box rooms and difficult inner mold removal during the prefabrication process.In order to solve these problems,this paper analyzes the prefabrication process of the frame structure without a bottom plate and introduces the split-type hydraulic telescopic automatic demolding process and the electric steam curing process.The results show that the automatic demolding process solves the problem that manual work cannot be carried out due to the high temperature in the inner cavity after concrete pouring of theπ-shape beam plate.The electric steam curing process can compress the age required for lifting components,save the amount of formwork,and improve the prefabrication efficiency.

关 键 词:装配式 π形梁板 蒸汽养护 自动脱模 

分 类 号:U656.113[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象