检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:凌平 LING Ping(Liuzhuang Coal Mine,China Coal Xinji Energy Co.,Ltd.,Fuyang 236000,Anhui,China)
机构地区:[1]中煤新集能源股份有限公司刘庄煤矿,安徽阜阳236000
出 处:《能源与节能》2023年第5期166-169,共4页Energy and Energy Conservation
摘 要:结合150804工作面水文地质条件,首次采取岩巷长距离、大规模集中探放老空水的方式疏放150802采空区(外段)积水,减少了探放采空区积水施工次数,提高了巷道掘进效率,同时保障了施工作业安全。以井下掘进工作面水害的安全防治为对象开展探究,结合具体工程实际,运用钻探方式,制定了针对性的水害防治措施,确保生产安全、持续开展的同时实现了对井下水害威胁的综合防治,对矿井综合效益的提升提供了积极助推。Combined with the hydrogeological conditions of 150804 working face,the method of long-distance and large-scale concentrated exploration and drainage of old goaf water in rock roadway was adopted for the first time to drain the accumulated water in 150802 goaf(outer section),which reduced the number of construction times of exploration and drainage of accumulated water in goaf,improved the efficiency of roadway excavation,and ensured the safety of construction industry.With the safety prevention and control of water damage on underground driving face as the object of exploration,combined with the specific engineering practice,the use of drilling methods,the formulation of targeted water damage prevention and control measures to ensure the continuous and safety development of production,while realizing the comprehensive prevention and control of underground water damage threat,to provide a positive boost to the increase of the comprehensive benefits of the mine.
分 类 号:TD745.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7