检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁腾飞 Yuan Teng-fei(Tong Yuan Design Group Co.,Ltd.,Jinan 250101,Shandong Province,China)
机构地区:[1]同圆设计集团股份有限公司,山东济南250101
出 处:《建筑与装饰》2023年第10期10-12,共3页Construction & Decoration
摘 要:城镇供热热水管道安装中,通常采用直埋敷设的形式。而直埋热水管道施工中经常遇到现场施工情况与设计图纸有出入的地方,如:湿陷性黄土、管道标高冲突、管道分支开口位置变动等。针对此类情况,本文根据实际处理情况及实践结果,介绍常见的几种现场施工问题的处理方法,希望对施工人员在今后遇到类似情况时有一定的借鉴作用。In the installation of urban heating hot water pipelines,the form of direct burial laying is usually adopted.In the construction of directly buried hot water pipelines,it is often encountered that there are discrepancies between the onsite construction conditions and the design drawings,such as:collapsible loess,pipeline elevation conflicts,and changes in the position of pipeline branch openings.In view of such situations,this paper introduces the handling methods of several common on-site construction problems according to the actual handling situation and practical results,hoping to have a certain reference effect when construction personnel encounter similar situations in the future.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7