检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈敬江 张毅 CHEN Jing-jiang;ZHANG Yi(Guizhou Water Resources and Hydropower Survey and Design Research Institute Co.Ltd.,Guiyang 550002,China)
机构地区:[1]贵州省水利水电勘测设计研究院有限公司,贵阳550002
出 处:《水利科技与经济》2023年第5期57-62,共6页Water Conservancy Science and Technology and Economy
摘 要:以贵州某水库大坝工程为研究对象,采用混凝土面板堆石坝形式,通过三维有限元法及材料力学法,对该工程的高趾墙进行动力响应分析。结果表明,高趾墙底部所受截面应力均高于上部所受应力,应力差异均在2MPa范围内,最大应力集中在高趾墙与坝体底部连接位置。混凝土面板堆石坝高趾墙能够确保水库工程整体质量,研究成果可为水利工程高趾墙的施工与维护提供技术参考。Taking a reservoir dam project in Guizhou as the research object,the concrete face rockfill dam is adopted for construction,and the dynamic response of the high toe wall of the project is analyzed by three-dimensional finite element method and material mechanics method.The test results show that the section stress at the bottom of the high toe wall is higher than that at the upper part,and the stress difference is within the range of 2MPa.The maximum stress is concentrated at the connection between the high toe wall and the dam bottom.The high toe wall of concrete face rockfill dam can ensure the overall quality of the reservoir project and provide technical reference for the construction and maintenance of the high toe wall of hydraulic engineering.
关 键 词:面板堆石坝 高趾墙 材料力学法 有限元法 应力分析
分 类 号:TV641.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.188.228