检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李伟[1] LI Wei(China Railway SIYUAN Survey and Design Group Co.,Ltd Wuhan 430063)
机构地区:[1]中铁第四勘察设计院集团有限公司线站院,武汉430063
出 处:《铁道勘测与设计》2023年第2期10-13,共4页Railway Survey and Design
摘 要:新建铁路杭州萧山机场站枢纽及接线工程位于浙江省北部长三角核心区域,嘉兴市、杭州市与绍兴市境内。沿线地貌上属冲海积平原,地形平坦、开阔,辟为农田,线路穿过钱塘江水系和杭嘉湖水系。本文取三个局部地段作为研究对象,根据控制因素、经济技术比较以及地方政府意见从列出的方案中比选出较优方案,为相关类似工程提供参考。Hangzhou XIAOSHAN AIRPORT STATION HUB AND CONNECTION PROJECT OF THE NEW RAILWAY IS LOCATED IN THE core region of the Yangtze RIVER Delta in THE north of Zhejiang Province,within the territory of Jiaxing,Hangzhou and SHAoxing.The landform along the line is a alluvial plain,flat,open terrain,farmland,the line through the Qiantang River system and Hangjiahu River system.In this paper,three local areas are selected as the research objects.According to the control factors,economic and technological comparison and the opinions of the local government,the better scheme is selected from the listed schemes,so as to provide reference for the related similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.35