作 者:龙关旭 仲轩阳 张泽军 段树坤 岳秀鹏 LONG Guan-xu;ZHONG Xuan-yang;ZHANG Ze-jun;DUAN Shu-kun;YUE Xiu-peng(Innovation Research Institute of Shandong Hi-Speed Group Co.,Ltd.,Jinan 250101,China;Shandong Key Laboratory of Highway Technology and Safety Assessment,Jinan 250101,China;Key Laboratory of Civil Engineering Safety and Durability of Ministry of Education,Department of Civil Engineering,Tsinghua University,Beijing 100084,China;Shandong Hi-Speed Infrastructure Construction Co.,Ltd.,Jinan 250014,China)
机构地区:[1]山东高速集团有限公司创新研究院,山东济南250101 [2]山东省高速公路技术和安全评估重点实验室,山东济南250101 [3]清华大学土木工程安全与耐久教育部重点实验室,北京100084 [4]山东高速基础设施建设有限公司,山东济南250014
出 处:《世界桥梁》2023年第3期112-118,共7页World Bridges
基 金:国家自然科学基金重点项目(51890903);山东省自然科学基金青年项目(ZR2020QE261)。
摘 要:某立交桥为7跨20 m预应力空心板简支梁桥,运营多年后发现主梁整体性不足,单梁受力状况突出,桥面板出现纵向开裂等病害,同时桥墩盖梁出现弯曲裂缝,侧向挡块破损严重。针对病害情况,确定采用外包钢板加固盖梁、钢-混组合梁替换旧桥部分薄弱梁体、中部三跨由简支到三跨连续的结构体系转换等方法对桥梁进行加固改造。加固改造设计验算结果表明:加固改造完成后的桥梁承载能力能够满足目前的设计需求,具备较高的安全储备。加固改造施工时,采用人工配合风镐拆除旧桥桥面板,吊除梁体;按照设计的加固位置采用外包钢板加固盖梁;钢-混组合梁施工采用先吊装单根钢梁、后吊装横向联系梁的方案;按施工工序进行钢-混结合部和桥面铺装施工。该桥加固改造完成后桥梁运营状况良好。After years of operation,the integrity of the superstructure of the overpass,which is a prestressed,simply-supported,hollow core beam structure with seven spans of 20 m,had been insufficient.Deteriorations,including longitudinal cracks in the deck slabs,bending cracks in the cap beams of piers and broken lateral stoppers,were observed in the bridge.The proposed remedial solution was to encase the cap beams with steel plates,replace the vulnerable original beams to steel-concrete composite beam,and transform the intermediate three simply-supported spans to a continuous unit.The verification of the rehabilitation design demonstrates that the load bearing capacity of the bridge still meets the current design requirements after the completion of rehabilitation,and the bridge has a large safety margin.During the rehabilitation,the crew demolished the original deck slabs with the assistance of pneumatic pick,and removed the beams.At the designated locations,the cap beams were encased with steel plates.During the construction of the steel-concrete composite beam,the individual steel girders were hoisted ahead of the connecting cross beams.The construction of the steel-concrete joint section and deck pavement was carried out in accordance with the construction procedure.After rehabilitation,the service condition of the bridge is good.
关 键 词:立交桥 预应力空心板梁桥 外包钢板 钢-混组合梁 结构体系转换 加固改造设计与施工
分 类 号:U448.17[建筑科学—桥梁与隧道工程] U445.7[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.218.86