医院综合楼高大梁模板满堂脚手架搭设施工技术  

Construction Technology of High Beam Formwork and Full Scaffold in Hospital Complex Building

在线阅读下载全文

作  者:吴德儒 李志强 WU De-ru;LI Zhi-qiang(China First Metallurgical Group Co.Ltd.,Wuhan 430081,China;Panzhihua Central Hospital,Panzhihua 617000,China)

机构地区:[1]中国一冶集团有限公司,武汉430081 [2]攀枝花市中心医院,四川攀枝花617000

出  处:《工程建设与设计》2023年第8期95-97,共3页Construction & Design for Engineering

摘  要:以某医院建设工程项目作为研究案例,对高大梁模板满堂脚手架施工技术进行深入研究,先确定搭设方案,再进行受力计算,最后详细阐述施工技术要点,并简要介绍了大梁模板的监测方法。经研究得出结论:建筑工程施工过程中,高大梁模板支撑架施工具备危险性,稍有不慎就会导致安全事故的发生,所以,在对其进行施工时必须对施工技术的选择予以重视。This paper takes a hospital construction project as a case study, the construction technology of high girder formwork full hall scaffolding is studied in depth, first determines the erection scheme, and then calculates the force, and finally elaborates on the key points of construction technology, and briefly introduces the monitoring method of the girder formwork, to ensure the stability of the tall formwork and provide good security for the construction project. The study concludes that: in the construction process, the construction of high girder formwork support frame has the risk, the slightest mistake will lead to the outbreak of safety accidents, so we must pay attention to the selection of construction technology.

关 键 词:高大梁模板 满堂脚手架 施工技术 方案论证 安全措施 

分 类 号:TU731.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象