大跨度连续箱梁施工控制  被引量:1

Construction Control of Long Span Continuous Box Girder

在线阅读下载全文

作  者:杨龙 张嘉鑫 YANG Long;ZHANG Jia-xin(No.2 Engneering Company Ltd.ofCCCC First Harbor Engnineering Company Ltd.,Qingdao 266071,China)

机构地区:[1]中交一航局第二工程有限公司,山东青岛266071

出  处:《工程建设与设计》2023年第8期116-119,共4页Construction & Design for Engineering

摘  要:连续梁施工中,挂篮设计和施工监控是施工中的关键环节,而线性控制更是施工中的重中之重。318国道湖州南浔至吴兴段改建工程中白米塘大桥主桥采用三跨连续梁设计,施工中存在桥面跨度、宽度均较常规连续梁尺寸大,受力较为复杂,挂篮模板设计、加工难度大等主要技术难题。论文结合白米塘大桥主桥连续梁的施工,阐述挂篮模板设计及施工监控方法。In the reconstruction project of Nanxun to Wuxing section of 318 National Highway, the main bridge of Baimitang Bridge adopts the design of three-span continuous beams. The main technical problems in the construction are as follows: the span and width of the bridge deck are larger than that of the conventional continuous beams, the force is more complex, and the design and processing of hanging basket template are difficult. In continuous beam construction, basket design and construction monitoring are the key links, and linear control is the priority among priorities. In this paper, combined with the construction of the continuous beam of the main bridge of Baimidang Bridge, the design and construction monitoring methods of the hanging basket template are expounded,the successful completion of handover and acceptance of the closure has a strong reference significance for similar projects.

关 键 词:大跨度连续梁 挂篮设计 施工监控 

分 类 号:U448.215[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象