检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨龙 张嘉鑫 YANG Long;ZHANG Jia-xin(No.2 Engneering Company Ltd.ofCCCC First Harbor Engnineering Company Ltd.,Qingdao 266071,China)
机构地区:[1]中交一航局第二工程有限公司,山东青岛266071
出 处:《工程建设与设计》2023年第8期116-119,共4页Construction & Design for Engineering
摘 要:连续梁施工中,挂篮设计和施工监控是施工中的关键环节,而线性控制更是施工中的重中之重。318国道湖州南浔至吴兴段改建工程中白米塘大桥主桥采用三跨连续梁设计,施工中存在桥面跨度、宽度均较常规连续梁尺寸大,受力较为复杂,挂篮模板设计、加工难度大等主要技术难题。论文结合白米塘大桥主桥连续梁的施工,阐述挂篮模板设计及施工监控方法。In the reconstruction project of Nanxun to Wuxing section of 318 National Highway, the main bridge of Baimitang Bridge adopts the design of three-span continuous beams. The main technical problems in the construction are as follows: the span and width of the bridge deck are larger than that of the conventional continuous beams, the force is more complex, and the design and processing of hanging basket template are difficult. In continuous beam construction, basket design and construction monitoring are the key links, and linear control is the priority among priorities. In this paper, combined with the construction of the continuous beam of the main bridge of Baimidang Bridge, the design and construction monitoring methods of the hanging basket template are expounded,the successful completion of handover and acceptance of the closure has a strong reference significance for similar projects.
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.230.65