检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余亮 宁帅朋 龙海波 李布辉 谈磊 YU Liang;NING Shuaipeng;LONG Haibo;LI Buhui;TAN Lei(China Energy Engineering Group Jiangsu Power Design Institute Co.,Ltd.,Nanjing 211100,China)
机构地区:[1]中国能源建设集团江苏省电力设计院有限公司,江苏南京211100
出 处:《电力勘测设计》2023年第5期12-18,共7页Electric Power Survey & Design
摘 要:本文从设计角度出发,介绍凤城—梅里长江大跨越工程基础试桩及设计方案,并针对杆塔与基础连接型式、基础变形控制、渗流等内容进行了分析。结果表明:软土地质条件下,超长桩应按照摩擦桩进行设计;跨越塔与基础采用内外双圈地脚螺栓型式;连梁可显著提高基础抗水平变形能力。From the point of view of design,this paper introduces the foundation design and pile test scheme of Fengcheng Meili Yangtze River crossing project.The connection between tower and foundation,foundation deformation control and seepage are analyzed.The results show that the super long pile should be designed as friction pile in soft soil;Internal and external double circle anchor bolts are used for connection between crossing tower and foundation;Coupling beam can significantly improve the horizontal deformation resistance of foundation.
关 键 词:超高输电塔 灌注桩 试桩 内外双圈地脚螺栓 基础变形
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13