作 者:张昊 高璇 穆思叶 ZHANG Hao;GAO Xuan;MU Siye(CNOOC Research Ltd.,Beijing 100028,China)
机构地区:[1]中海油研究总院有限责任公司,北京100028
出 处:《电工技术》2023年第7期107-108,共2页Electric Engineering
摘 要:我国渤海油田海上平台数量较多,负荷差异较大,海底管道布局复杂,因此渤海油田岸电工程建设的220kV海上变电站选址需要考虑的因素较多。结合渤海岸电应用工程实例,分析影响海上变电站选址的关键因素,并对站址选择问题进行量化分析,从而得到最优的选址方案。There are many offshore platforms in China's Bohai Oil Field,with large load differences and complex submarine pipeline layout.Therefore,there are many factors to be considered in the site selection of 220kV offshore substation for offshore power project construction in Bohai Oil Field.Combined with the example of Bohai offshore power application project,the key factors affecting the location of offshore substation are analyzed.The problem of site selection is quantitatively analyzed to obtain the optimal location scheme.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171