检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐焕焕 张宝红 XU Huanhuan;ZHANG Baohong(Liuzhou Bureau of China Southern Power Grid Extra High Voltage Power Transmission Company,Liuzhou 545000,China)
机构地区:[1]中国南方电网超高压输电公司柳州局,广西柳州545000
出 处:《电工技术》2023年第7期188-191,共4页Electric Engineering
摘 要:通过研究昆柳龙直流输电工程的典型电子式电流互感器测量异常事件,分析不同测点的测量异常对直流控制保护系统的影响,以及电子式电流互感器出现测量异常的原因。最后介绍了昆柳龙直流工程目前针对电子式电流互感器测量异常的处置策略,对其他特高压直流工程电子式电流互感器测量异常处置具有参考意义。By studying the typical abnormal measurement events of electronic current transformers in the Kunliulong UHVDC,the influence of abnormal measurement at different measuring points on DC control and protection system and the reason of abnormal measurement of electronic current transformer are analyzed.Finally,the current disposal strategy of Kunliulong DC engineering for the measurement abnormality of electronic current transformer is introduced,which has reference significance for the abnormal measurement of electronic current transformer in other UHVDC projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.41.47