检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙君朋 郑慧丽 刘静 燕晨阳 Sun Junpeng;Zheng Huili;Liu Jing;Yan Chenyang(TBEA Xi'an Electric Technology Co.,Ltd.,Xi'an Shaanxi 710117)
机构地区:[1]特变电工西安电气科技有限公司,陕西西安710117
出 处:《现代工业经济和信息化》2023年第4期253-255,共3页Modern Industrial Economy and Informationization
摘 要:以集中式光伏并网发电系统为对象,开展基于RT-LAB、RTE-Drive的光伏并网系统半实物仿真建模研究,针对高开关频率下仿真步长过大引起脉冲失真问题,提出一种针对光伏逆变器的高频脉冲插值仿真方法,并进行对比仿真测试。结果表明,提出的插值仿真方法能够准确捕捉高频脉冲变化情况,提高系统稳定性和响应速度,满足高开关频率测试要求。Taking the centralized photovoltaic grid connected power generation system as the object,this paper carries out the semi physical simulation modeling research of photovoltaic grid connected system based on RT-Lab RTE-Drive.Aiming at the problem of pulse distortion caused by large step size at high switching frequency,a high frequency pulse interpolation simulation method for photovoltaic inverter is proposed.The comparative simulation test is carried out.The results show that the proposed interpolation simulation method can accurately capture the changes of high-frequency pulses,improve the stability and response speed of the system,and meet the requirements of high switching frequency test.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7