敞开式TBM掘进施工中围岩坍塌防治技术  被引量:6

Collapse prevention technology of surrounding rock in tunneling construction of open-type TBM

在线阅读下载全文

作  者:徐相利 刘长春 任大勇 李明[2] 孙星辰 XU Xiangli;LIU Changchun;REN Dayong;LI Ming;SUN Xingchen(China Coal Tunnel Engineering Company Limited,Xuzhou 221000,China;State Key Laboratory of Geomechanics and Deep Underground Engineering,China University of Mining and Technology,Xuhzou 221116,China)

机构地区:[1]中煤隧道工程有限公司,江苏徐州221000 [2]中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州221116

出  处:《建井技术》2023年第2期26-29,51,共5页Mine Construction Technology

基  金:深地科学与工程云龙湖实验室资金资助项目(104023006)。

摘  要:矿井建设随着科学技术的不断进步与发展,在机械化、自动化、智能化施工方面不断创新发展。面对我国劳动力市场日益紧张的严峻形势和应对复杂地质环境的不安全因素,全断面岩石隧道掘进机(TBM)施工技术成为矿井巷道施工的引领者和未来发展的主要方向。但TBM施工面对破碎、软弱、高温、高压等复杂的地质赋存环境,亟需对TBM设备进行革新改良,以更好地适应施工环境,创造安全高效的施工条件。对山东新巨龙煤矿采用TBM法施工的实际应用中存在的问题进行总结分析,通过处理软弱岩帮,确保TBM撑靴处围岩稳定,保证撑靴支撑力,保持TBM推进力,并同时对回风大巷顶板支护进行了研讨。论文的研究对于TBM全断面掘进机施工在煤矿领域的施工具有一定参考价值。With a continuous progress and development of the science and technology,the mine construction had a continuous innovation and development in the mechanized,automation and intelligent construction.Faced to the growing tension severe situation of the labor market in China and to reply the unsafe factors of the complex geological environment,the full face rock tunnel boring machine(TBM)construction technology became the leader of mine roadway construction and the main direction of the future development.Faced to the broken,weak,high temperature,high pressure and other complicated geological environment by the construction of the TBM,the TBM equipment should have an innovation and improvement in order to better fit the construction environment and to create a safe and efficient construction condition.The paper had a summary analysis on the problems existed in the actual application of the TBM construction in Shandong Xinjulong Mine.The treatment of the weak rock sidewall could ensure the surrounding rock stability at the TBM gripper shoes,could assure the support power of the gripper shoes and could keep the TBM propulsive force.Meanwhile the paper had a discussion on the roof support of the mine air return roadway.The study of the paper could have a certain reference value to the TBM construction in the coal mines.

关 键 词:矿井建设 TBM 撑靴 软弱围岩 顶板支护 

分 类 号:TD67[矿业工程—矿山机电] U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象