盐池渡槽预制槽身优化钢模施工工法研究  被引量:2

Optimized Steel Mold Construction Method for Prefabricated Aqueduct Structure in Yanchi Aqueduct Project

在线阅读下载全文

作  者:刘剑[1] 张红霞[1] 陈崇德[1] LIU Jian;ZHANG Hongxia;CHEN Chongde(Hubei Zhanghe Project Administration Bureau,Jingmen 448156,China)

机构地区:[1]湖北省漳河工程管理局,湖北荆门448156

出  处:《水电与新能源》2023年第5期39-42,46,共5页Hydropower and New Energy

摘  要:依据湖北省漳河水库灌区盐池渡槽拆除重建工期紧、任务重的实际,研究了盐池渡槽预制槽身优化钢模施工工法。并对该工法的工艺原理、工艺流程、施工过程及操作要点、应用实例、质量保证措施、效益分析等进行了简要分析,对于指导同类型渡槽新建或原地拆除重建施工,具有一定的借鉴作用。The demolition and reconstruction work of the Yanchi Aqueduct project in Zhanghe Reservoir Irrigation Area in Hubei Province is of a tight schedule and heavy workload.An optimized steel mold construction method is thus proposed for the prefabricated aqueduct structure.The principles,work flow,and key points of the construction process,and application examples,quality control measures,and benefit analysis of the proposed construction method are briefly analyzed.It can be useful reference for the construction of the same type aqueducts.

关 键 词:钢模 优化 工法研究 盐池渡槽 

分 类 号:TV672.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象