检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴盼盼 王新[1] 谢斐[1] WU Panpan;WANG Xin;XIE Fei(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443002,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2023年第5期59-62,共4页Hydropower and New Energy
摘 要:在水电厂机组检修过程中,经常会遇到常规工器具无法解决的难题,必须依据现场实际情况,设计制作专用工器具。在水布垭电厂水轮机扩修过程中,检修人员设计制作了多种专用的工器具和工装,极大地提升工作效率,降低劳动力投入,消除施工过程中存在的安全隐患,使机组检修质量得到了保障,检修工作更加专业化、规范化。In the unit maintenance of hydropower plants,there are often problems that cannot be solved by conventional tools and instruments.Therefore,special tools and instruments must be designed and made based on the actual in-situ situations.During the extended maintenance of hydro-turbines in Shuibuya Hydropower Plant,a variety of special tools and instruments are designed and made,which greatly improve the work efficiency and reduce the labor input.Also,the potential safety risks of the construction process are eliminated and the maintenance quality is ensured.The maintenance work can be more professional and standardized.
分 类 号:TK73[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249