检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江浩 JIANG Hao(Jintai Railway Co.,Ltd.,Taizhou Zhejiang 318000)
出 处:《湖北理工学院学报》2023年第3期30-33,54,共5页Journal of Hubei Polytechnic University
摘 要:节段梁预制拼装技术在铁路桥梁建设中的应用越来越广泛。针对铁路曲线节段梁预制的施工要求,采用了长、短线法结合的预制方法,通过原理分析,确定了长短线法的线形控制方法。为了更好地分析长短线法在曲线铁路梁桥中的应用,提出了质量“四控”,通过数据分析得出了曲线梁桥线形控制过程中的重点,探讨了各质量影响的综合程度,可为后续其他类似工程的线形控制提供参考。The segmental beam prefabricated assembly technology has widely been used in railroad bridge construction.Aiming at the construction requirements of railway curve segment beam prefabrication,the long and short line prefabrication method is adopted.The linear control method of long and short line method is determined through the principle analysis.In order to better analyze the application of the long and short line method in the curved railroad girder bridge,the"four controls"of quality are proposed,and the focus of the curve girder bridge alignment control process is derived through data analysis,and the comprehensive degree of each quality influence is discussed,which can provide reference for the subsequent alignment control of other similar projects.
分 类 号:TU745.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90