检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张德亮 段琰璞 倪爽 ZHANG De-liang;DUAN Yan-pu;NI Shuang(State Nuclear Power Demonstration Plant Co.,Ltd.,Rongcheng 264300,China)
机构地区:[1]国核示范电站有限责任公司,山东荣成264300
出 处:《变压器》2023年第5期48-52,共5页Transformer
摘 要:本文作者介绍了某核电厂辅助变压器分闸过程中出现异响,利用PSCAD/EMTDC搭建了辅助变压器运行系统仿真模型并进行了仿真,结合实测电压、电流、超声信号及仿真结果,提出了低压侧增加电抗器进行补偿的方法。通过再验证试验,验证了增加电抗器可消除变压器分闸脉冲电流、平顶电压及异响,有效保证了变压器安全稳定运行。This paper introduces the abnormal noise in the opening process of the auxiliary transformer in a nuclear power plant.Using PSCAD/EMTDC,a simulation model of the auxiliary transformer operation system is built and simulated.Combining the measured voltage,current,ultrasonic signals and simulation results,a method of adding reactors to the low-voltage side for compensation is proposed.Through the reverification test,it is verified that adding reactor can eliminate the pulse current,flat top voltage and abnormal noise of transformer opening,and effectively ensure the safe and stable operation of transformer.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28