预制排架柱的制作方法及吊装验算  

Prefabricated Frame Column Production Method and Lifting Calculation

在线阅读下载全文

作  者:庄炳芮 ZHUANG Bing-rui(CISDIEngineering Co.Ltd.,Shanghai 200940,China)

机构地区:[1]中冶赛迪上海工程技术有限公司,上海200940

出  处:《工程建设与设计》2023年第9期172-175,共4页Construction & Design for Engineering

摘  要:因预制柱在吊装施工阶段的受力状态与厂房使用阶段的受力状态不同,因此,设计时应考虑施工工况对预制柱截面、配筋等的影响,并进行分析计算。论文以预制格构双肢柱为例,介绍了预制双肢柱的现场制作方法,对五点翻转、三点起吊的吊装施工方案进行分析介绍,并进行了对应的计算分析,以确保吊装施工安全。As the stress state of the precast column in the hoisting construction stage is different from that of the workshop in the use stage,influence of construction condition on precast column should be considered during the design stage.Taking precast lattice double column as an example,this paper first introduces the on-site manufacturing method of prefabricated double column,and then introduces the lifting construction scheme offive-point turnover and three-point lifing,and carries out the corresponding calculation and analysis to ensure the safety oflifting construction.

关 键 词:铰接排架 预制柱 翻转验算 吊装验算 

分 类 号:TU756[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象