检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜赫名 JIANG Heming(Miaogou Iron Mine of Hebei Iron and Steel Group Mining Co.,Ltd.,Qinhuangdao 066000,China)
机构地区:[1]河北钢铁集团矿业有限公司庙沟铁矿,河北秦皇岛066000
出 处:《矿业工程》2023年第3期18-22,共5页Mining Engineering
摘 要:如何提高矿石回采率,是目前露天转井下过渡时期的关健问题。针对这一问题,论述了河钢集团矿业公司庙沟铁矿露天转井下过渡阶段采用挂帮矿的开采工艺方法,主要阐述了优化井下回采穿爆参数及提高设备铲装效率,进而提高矿石回采率,增加经济效益。How to improve the recovery rate of ore is the key problem in the transition period from open pit to underground.In view of this problem,this paper discusses the mining technology of pit wall-connected ore body in the transition stage from open pit to underground in Miaogou Iron Mine of Hebei Iron and Steel Group Mining Co.,Ltd,and mainly expounds the optimization of underground mining blasting parameters and the improvement of equipment shovel loading efficiency,so as to improve the ore recovery rate and increase economic benefits.
分 类 号:TD861[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7