检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Raphael Pfaff
机构地区:[1]FH Aachen University of Applied Sciences,Goethestr.1,52064 Aachen,Germany
出 处:《Railway Engineering Science》2023年第2期135-144,共10页铁道工程科学(英文版)
基 金:funding of the SAMIRA project by the European Regional Development Fund under grant number 0801689
摘 要:The first and last mile of a railway journey, in both freight and transit applications, constitutes a high effort and is either non-productive(e.g. in the case of depot operations) or highly inefficient(e.g. in industrial railways). These parts are typically managed on-sight, i.e. with no signalling and train protection systems ensuring the freedom of movement. This is possible due to the rather short braking distances of individual vehicles and shunting consists. The present article analyses the braking behaviour of such shunting units. For this purpose, a dedicated model is developed. It is calibrated on published results of brake tests and validated against a high-definition model for lowspeed applications. Based on this model, multiple simulations are executed to obtain a Monte Carlo simulation of the resulting braking distances. Based on the distribution properties and established safety levels, the risk of exceeding certain braking distances is evaluated and maximum braking distances are derived. Together with certain parameters of the system, these can serve in the design and safety assessment of driver assistance systems and automation of these processes.
关 键 词:Freight rail SHUNTING Braking curves Brake set-up Driver assistance system Automatic train operation
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.57