检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙兰宁 魏海涛[2] Sun Lanning;Wei Haitao(China Civil Aviation Engineering Consulting Co.,Ltd.,Beijing 101318,China;AVIC Institute of Geotechnical Engineer Co.,Ltd.,Beijing 100098,China)
机构地区:[1]中国民航工程咨询有限公司,北京101318 [2]中航勘察设计研究院有限公司,北京100098
出 处:《岩土工程技术》2023年第3期361-364,共4页Geotechnical Engineering Technique
摘 要:通过介绍珊瑚砂吹填料工程特性,结合某岛国机场跑道地基处理工程,对吹填珊瑚砂地基处理方式进行比选分析,并针对振动碾压和冲击碾压两种处理方式开展小区试验,通过分析碾压影响深度及沉降变化,最终选用振动碾压地基处理方式。该工程已经完工,取得良好技术经济效益,可为类似工程提供借鉴。The engineering characteristics of dredged coral sand were introduced,and the foundation treatment methods of airport runway in an island country were analyzed and selected.Based on the vibration compaction and impact compaction experiments,the vibration roller compaction method was selected by analyzing the influence depth and settlement variation.The project has been completed and achieved good technical and economic results,which can provide reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7