1000 MW发电机进相运行的探究及建议  被引量:3

Exploration and Suggestion of 1000 MW Generator Leading Phase Operation

在线阅读下载全文

作  者:胡乃进 HU Naijin(Shandong Energy Inner Mongolia Shenglu Electric Power Co.,Ltd.,Taian,Shandong 271099,China)

机构地区:[1]山东能源内蒙古盛鲁电力有限公司,山东泰安271099

出  处:《东北电力技术》2023年第5期23-26,41,共5页Northeast Electric Power Technology

摘  要:发电机进相运行可有效改变电网无功潮流的分布,提高电网供电质量,调控电网电压,因此逐步成为调节系统无功和电压的有效手段。从发电机进相运行的机理出发,对进相运行时的状态、运行特点、进相限额进行分析,并结合实际运行数据总结出进相运行时注意事项及措施,为多机进相运行的深入开展提供参考。The leading phase operation of the generator can effectively change the distribution of reactive power flow,improve the quality of power supply and regulate the voltage of the grid.So it gradually becomes an effective method to regulate the reactive power and voltage of the system.It starts from the mechanism of the leading phase opeartion.It starts from the mechanism of the generator leading phase operation,its state,characteristics,and limit of the input phase are analyzed.Combined with the actual operation data,the notes and measures for leading phase operation are summarized,providing a reference for the further development of multi-machine leading phase operation.

关 键 词:发电机 进相运行 无功功率 

分 类 号:TM314[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象