检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王年 Wang Nian(Shanghai Tunnel Engineering Co.,Ltd.,Shanghai 200232,China)
出 处:《山西建筑》2023年第12期95-97,101,共4页Shanxi Architecture
摘 要:大型深基坑工程围护结构往往采用支护桩+外拉锚支撑体系形式,昆明市西山区某医院在基坑开挖过程中因基坑围护变形过大,导致外拉锚受力出现红色预警,轴力达到设计极限抗拉强度,针对该情况,为满足后续开挖安全,提出围护桩-斜抛撑-结构底板的组合受力体系,利用数值分析原理对整个开挖过程进行计算分析,模拟开挖过程基坑支撑体系的受力和变形,并针对施工工程关键点进行施工控制,消除了锚索轴力变化带来的不利影响,有益于类似条件下的深基坑工程建设。The retaining structure of large-scale deep foundation pit engineering often adopts support pile+external anchor support system,during the excavation process of a certain hospital in Xishan District,Kunming City,due to excessive deformation of foundation pit retaining structure,a red warning appeared for the external anchor force,and the axial force reached the design ultimate tensile strength,in order to meet the safety of subsequent excavation,this paper proposed the combined force system of retaining pile-diagonal bracing-structural bottom plate,using numerical analysis principles to calculate and analyze the entire excavation process,simulate the stress and deformation of foundation pit support system during the excavation process,and carry out construction control for key points of the construction engineering,eliminating the adverse effects caused by the changes in anchor cable axial force,beneficial for the construction of deep foundation pit engineering under similar conditions.
分 类 号:TU753.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113