检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段俊英 Duan Junying(Shanxi Coking Coal Xishan Coal Electricity Tunlan Mine,Gujiao Shanxi 030200)
机构地区:[1]山西焦煤西山煤电屯兰矿,山西古交030200
出 处:《山西化工》2023年第5期160-162,共3页Shanxi Chemical Industry
摘 要:本煤层顺层钻孔在治理松软低透气性煤层瓦斯时面临钻孔工程量大、治理耗时长、瓦斯抽采效率偏低等问题,以21303综放工作面为工程研究对象,提出将定向长钻孔应用到煤层瓦斯预抽中。利用定向长钻孔施工距离长、精度高以及钻孔孔径大优势实现煤层瓦斯高效预抽,钻孔布置不受采面回采巷道掘进影响。现场应用后,定向长钻孔瓦斯抽采纯量可达到0.90 m3/min,较本煤层顺层钻孔抽采纯量高6倍,瓦斯预抽效果显著,实现了松软低透气性煤层瓦斯高效抽采。In the treatment of soft and low permeability coal seam gas in this coal seam,drilling along the seam faces problems such as large drilling workload,long treatment time,and low gas extraction efficiency.Taking 21303 fully mechanized caving face as the engineering research object,it is proposed to apply directional long drilling to coal seam gas pre-extraction.Utilizing the advantages of long directional drilling construction distance,high accuracy,and large borehole diameter to achieve efficient pre-extraction of coal seam gas,the drilling layout is not affected by the excavation of the mining face and roadway.After on-site application,the pure gas extraction volume of directional long drilling can reach 0.90 m3/min,which is 6 times higher than the pure gas extraction volume of this coal seam bedding drilling.The gas pre-extraction effect is significant,achieving efficient gas extraction in soft and low permeability coal seams.
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49