检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏拓 Wei Tuo(Liaoning Transportation Development Center,Shenyang 110000,China)
机构地区:[1]辽宁省交通运输事业发展中心,沈阳市110000
出 处:《北方交通》2023年第5期9-12,共4页Northern Communications
摘 要:为了更好地掌握斜拉桥使用状态,对斜拉桥的成桥荷载试验及运营期的承载能力进行评估就显得至关重要。列举工程实例,详细阐述了独塔单索面转体施工斜拉桥的计算及荷载试验过程,主要包括斜拉桥有限元仿真模型的建立方法、动静载荷试验工况的设置、关键断面试验测点的布设、以及斜拉桥的自然脉动和动态跑车试验测试的相关参数及要求。同时,结合实例对荷载试验数据的分析研判做出阐释,可对此类工程提供参考。In order to better understand the use status of the cable-stayed bridge,it is crucial to perform the load test on the completed bridge and evaluate the bearing capacity of the cable-stayed bridge during operation.The calculation and load test process of the cable-stayed bridge with single-pylon and single-plane swivel construction are elaborated in detail by citing engineering examples,mainly including the establishment method of the finite element simulation model of the cable-stayed bridge,the setting of dynamic and static load test conditions,the layout of key section test points,and the relevant parameters and requirements for natural pulsation and dynamic sports car test of the cable-stayed bridge.At the same time,the analysis,research and judgment of load test data are explained in combination with the living example,so as to provide reference for carrying out this type of work.
关 键 词:转体法施工斜拉桥 有限元仿法真模拟 静载试验 动载试验 承载能力评估
分 类 号:U441.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7