检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吉彬 胡宇 韦金禧 JI Bin;HU Yu;WEI Jinxi(Chongqing Luohuang Power Generation Co.,Ltd.of CHNG,Chongqing 402283,P.R.China)
机构地区:[1]华能重庆珞璜发电有限责任公司,重庆402283
出 处:《重庆电力高等专科学校学报》2023年第2期31-35,共5页Journal of Chongqing Electric Power College
摘 要:为提高机组运行的快速性和稳定性,结合某电厂4#机组亚临界参数中储式磨煤机系统的实际情况,在不经过机务改造的前提下,采用运行方式调整、多变量协同控制等手段,对4#机组自动控制系统进行优化。经过机组AGC运行考验,4#机组协调控制系统调节品质得到显著提升,能够满足电网AGC考核要求,达到了机组快速、稳定运行的目标。In order to improve the rapidity and stability of the operation of the unit,in combination with the actual situation of the subcritical parameter coal mill system with the intermediate storage bunker of 4#unit in a power plant,the automatic control system of the unit was optimized by means of the adjustment of the operating mode and the multi-variable coordinated control without the maintenance modification.The AGC operating test of the unit shows that the quality of modification of the coordinated control system of 4#unit has been greatly improved,which can meet the AGC assessment requirements of the power grid and achieve the goal of rapid and stable operation of the unit.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.221.78