检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨俊槐 YANG Junhuai
机构地区:[1]厦门特房建设工程集团有限公司,福建厦门361001
出 处:《福建建设科技》2023年第3期102-104,共3页Fujian Construction Science & Technology
摘 要:本文分析了某高大空间仓库喷淋系统的设计过程,包括系统确定、喷头选择、喷头安装、管网管径计算等。结果表明:当仓库使用情况不明、净空高度未超过规范限值时,应采用喷淋系统,并建议采用ESFR喷头;设计中应避免各类障碍物对喷头洒水的影响;喷淋管径应经水力计算和造价分析综合确定。This article describes in detail the design process of sprinkler systems for a high and large space storage,including system determination,sprinkler selection,sprinkler installation,pipe network diameter calculation,and so on.The conclusion is that when the storage usage is unknown and the headroom does not exceed the specification limit,the sprinkler system should be used,and it is recommended to use ESFR sprinklers.The design should avoid the impact of various obstacles on sprinkler sprinkling.The pipe network diameter shall be determined comprehensively through hydraulic calculation and cost analysis.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.163.51